The Technical Committee of the NFPA 1194 meeting was held
in Seattle, WA on May 22 – 24, 2012. arvc
Representative Wade Elliott (Utility Supply Group) delivered arvc’s response to each of the 5
proposals. After compiling the responses from members all across the
country I provided them to Wade along with an official recommendation to reject
Proposals 1, 2, 3 & 4 which were rejected on the First Draft Result.
We did support Proposal 5. 7.8.2 Waste Treatment System. The
waste treatment system design capacity shall be based on a minimum discharge of
35 50 gallons (189.3 L) and a maximum of 60 100 gallons
(378.5 L) per day per site. This First Draft Result was Accept With
Revision.
3. Technical Committee meets to review comments and determine whether to affirm First Draft decision or reverse their decision on the proposal then generates Second Draft.
4. NFPA committees and Board of Directors meet to approve Second Draft and publishes results.